PAST PROGRAM

B767 – Vertical Fin

enlarge the image

B767 – Vertical Fin

enlarge the image

B767 Tanker

B767 Tanker

enlarge the image

B767 Tanker

enlarge the image

B767 Tanker

enlarge the image

B767 SF

B767 SF

enlarge the image

B767 SF

enlarge the image

OMA Sud is participating to the A380 – 800F Program as an Alenia supplier, with the responsibility to Design, Develop, Manufacture and Supply the Upper Deck Floor Grid, Sections 13 & 18.3, in compliance to Airbus methods and standards.

OMA SUD has the following main responsibility:
– Frontier and interface definition during a Common Phase (OMA Sud/Alenia/Airbus) in Hamburg.

– Design development and gradual release of information to allow the study of production activity before the release of officials drawings.

– Release of Space Allocation Models, 3D Models, Drawings.

– Stress analysis (Static, Fatigue and Damage Tollerance) and FEM approach to release justification documents.

– Planning and elaboration of the industrial engineering documentation for assembly jigs and tools to manufacture machined parts and sheet metal parts.

– Purchasing activities for raw materials, hardware, and chemical products.

– Management of all the activities for incoming, storage, and production control of raw materials, hardware and chemical products.

– Manufacturing of machined parts and sheet metal parts including applicable processes.
– Floor beam assembly.
– Delivery of the end item to Hamburg D.

SECTION 13

ENLARGE THE IMAGE

SECTION 18.3

ENLARGE THE IMAGE

Section 18.3 consists of:
– N° 6 Floor Beam from Al-Li extruted
– N° 12 Rail from Al-Li extruted
– N° 11 Longitudinal Beam
– Fittings, Angles, Supports e Fixed Brackets complete this section

Sub-wing pod manufacturing

enlarge the image

Sub-wing pod manufacturing

enlarge the image